Main points of later maintenance of membrane structure landscape
Membrane structure landscape architecture has widely appeared in our vision and life, and it is indispensable for the later maintenance and maintenance of membrane structure construction projects. The following are the main points for maintenance of Ruibo membrane structure:
1) Membrane structure maintenance and repair should be provided by the contractor in conjunction with the material supplier, production and installation unit, and design unit to provide a maintenance and repair manual, and the maintenance and repair work should be entrusted to a professional company and professional team;
2) The maintenance and repair of the membrane structure should be carried out in accordance with the individual project maintenance manual provided by the contractor, and the contractor should explain and guide the owner or management party according to its requirements;
3) The responsible party for maintenance management must keep the maintenance plan, maintenance record, maintenance report, and revision record documents;
4) All fasteners used in the project, such as bolts, rigging, anchors, etc., should not be rotated at will. When the project is completed 6 months after the completion of the project, the state of use should be checked, and if there is any looseness, it should be tightened and strengthened;
5) Membrane structure cleaning should be carried out in accordance with the regulations in the regulations;
6) Professional management personnel should inspect and clean the roof before the rainy season and winter every year to prevent loosening of waterproof nodes and blockage of water drips, gutters and cornices, and keep the roof drainage system unblocked;
7) According to the effective service life of the membrane material, it should be replaced in time;
8) All maintenance items for membrane structure buildings should include the shape of the membrane surface, deformation, initial tension state, all or partial wrinkles, ruptures and fractures;
9) The responsible party for maintenance management must confirm whether the membrane body is in a normal state through daily inspections. The main inspection items should include whether the membrane surface is deformed, whether the membrane body is broken, or whether the membrane material coating is peeled off;
10) The responsible party for maintenance management should inspect the membrane structure for abnormalities after severe weather such as strong winds and rainfall;